Case Studies

St. Helena's Centre

St. Helena's Centre

The Former St Helena’s centre was purchased by the University of Derby in 2014 with the vision as using the space as a base for vocational higher education. Heb Group have been commissioned to design and install new M & E services and systems, whilst maintaining the dignity of the existing listed building and contemporary extensions.

University of Sheffield, Samuel Fox House

University of Sheffield, Samuel Fox House

The scheme included the complete replacement of the central heating plant, to a gas fired 4 No modular boiler installation on pre-fabricated skid arrangement (from steam fed heat exchangers) and full new BMS to the full building.

Fire Safety Compliance Works at Manor House

Fire Safety Compliance Works at Manor House

Heb Group successfully completed essential fire safety compliance works at Manor House assisted living accommodation in Stannington. This project involved critical upgrades, including fire door and alarm replacements, fire stopping, emergency lighting enhancements, and asbestos removal, all conducted in a live environment with 50% occupancy.

Stocksbridge Regeneration Project, Fox Valley

Stocksbridge Regeneration Project, Fox Valley

H E Barnes equipped the leisure facility with a comprehensive automatic control and monitoring system utilising a proprietary Building Management System designed to control and monitor all of the engineering services, including air conditioning and heat recovery.