Case Studies
North Active
H E Barnes equipped the leisure facility with a comprehensive automatic control and monitoring system utilising a proprietary Building Management System designed to control and monitor all of the engineering services, including air conditioning and heat recovery.
Hayes Food Facility – Comprehensive MEP Fit-Out for Wealmoor Ltd
Heb Mechanical & Electrical was entrusted with delivering a full MEP (Mechanical, Electrical, and Plumbing) fit-out for the Hayes Food Facility, a major herb processing plant operated by Wealmoor Ltd.
Pioneering Sustainable Infrastructure at Infinity Park Warehouse Development
Heb Mechanical & Electrical delivered the full M&E package for a 507,000 sq ft distribution facility at Infinity Park, Derby. Designed for flexibility and sustainability, the project achieved BREEAM ‘Excellent’ and EPC ‘A’ ratings, with future-ready systems including solar panels, LED lighting, and air source heat pumps.
St. Helena's Centre
The Former St Helena’s centre was purchased by the University of Derby in 2014 with the vision as using the space as a base for vocational higher education. Heb Group have been commissioned to design and install new M & E services and systems, whilst maintaining the dignity of the existing listed building and contemporary extensions.
University of Sheffield, Samuel Fox House
The scheme included the complete replacement of the central heating plant, to a gas fired 4 No modular boiler installation on pre-fabricated skid arrangement (from steam fed heat exchangers) and full new BMS to the full building.
Elmfield Building Refurbishment, The University of Sheffield
The University of Sheffield needed to enhance the Elmfield Building, improving sustainability, safety, and accessibility while preserving its heritage. Working alongside Robertson Construction, we delivered a complete M&E refurbishment, futureproofing the space while maintaining its architectural integrity.