Case Studies

Broad Street Community Diagnostic Centre
The Heb Group successfully transformed an existing building into the state-of-the-art Broad Street Community Diagnostic Centre in Halifax. This fast-tracked project was completed in just 20 weeks and included comprehensive Mechanical and Electrical (M&E) system installations.

Doncaster Wool Market – Comprehensive M&E Services for a Historic Revitalisation
The Wool Market is a cornerstone of Doncaster’s historic Market District, which includes iconic structures such as the Corn Exchange, Fish Market, and Market Hall.

Fire Safety Compliance Works at Manor House
Heb Group successfully completed essential fire safety compliance works at Manor House assisted living accommodation in Stannington. This project involved critical upgrades, including fire door and alarm replacements, fire stopping, emergency lighting enhancements, and asbestos removal, all conducted in a live environment with 50% occupancy.

Hayes Food Facility – Comprehensive MEP Fit-Out for Wealmoor Ltd
Heb Mechanical & Electrical was entrusted with delivering a full MEP (Mechanical, Electrical, and Plumbing) fit-out for the Hayes Food Facility, a major herb processing plant operated by Wealmoor Ltd.

Transforming Sheffield's 'Heart of the City' with Cutting-Edge M&E Services
At The Heb Group, we are proud to have played a pivotal role in Sheffield City Council's 'Heart of the City' development, working with main contractor Henry Boot, managing all Mechanical and Electrical (M&E) services for Blocks H2 and H3. This project is a cornerstone of the Heart of the City II regeneration masterplan, aimed at revitalizing Sheffield's city center.

The Heb Group Elevated One Waterside Place with Advanced M&E Installations
The Heb Group provided advanced Mechanical and Electrical (M&E) installations for One Waterside Place, a seven-story multi-occupancy building with six lettable floors and a ground-floor retail space. This project was a significant component of the £340 million Chesterfield Waterside regeneration scheme, marking the completion of the Basin Square phase.