Fire Safety Compliance Works at Manor House

Fire Safety Compliance Works at Manor House

Heb Group successfully completed essential fire safety compliance works at Manor House assisted living accommodation in Stannington. This project involved critical upgrades, including fire door and alarm replacements, fire stopping, emergency lighting enhancements, and asbestos removal, all conducted in a live environment with 50% occupancy.

Stocksbridge Regeneration Project, Fox Valley

Stocksbridge Regeneration Project, Fox Valley

H E Barnes equipped the leisure facility with a comprehensive automatic control and monitoring system utilising a proprietary Building Management System designed to control and monitor all of the engineering services, including air conditioning and heat recovery.

Plot M

Plot M

The scheme is a 300,000 square foot warehouse and an office over 3 levels. The Client was B&K and the end user is a local and long established Electronic Component company called Premier Farnell.